Hi, I'm Mike Cohn and I am sure you know that I a big proponent of Agile. You almost certainly know I like estimating and planning and have written a book on that. I've written about these topics and believe these things because I have seen them work. Hey, I could be wrong. As a matter of fact, time has proven me wrong about some of the things I've written. Agile is about trying things. It's about experimenting, having a hypothesis, a best guess about the best way to achieve a result. But sometimes things don't work out for the better. And a big part of being agile is being able to admit that, to learn from it, and move on. Let me give you an example about deliberately setting up an environment where we could learn, even when we were wrong. Back in 1999, I was the vice president of engineering for a public company in Colorado. And I had a really good boss, the CEO. Things were going very well for this company. Our projects were finishing on time, and our products were successful. I wanted to take advantage of all of that to get good at something we we're not yet good, estimating. Our CEO knew that not every project would finish on time, and not ever product would make a ton of money. He wanted those things, of course, but he was realistic and knew it wouldn't always happen. I took advantage of this good situation, a successful company with a great CEO, to undertake an experiment. i told each of my development teams they had to estimate differently from every other team. When I first told everyone that each team had to estimate differently, it led to a wide range of estimating approaches being tried. We had teams doing good old task decomposition, which you think about the work and break it down into a big list of tasks. We also had teams doing parametric estimating. This is where you identify the parameters of an estimate and do things like multiply the number of expected lines of code times the domain complexity divided by the average number years of analyst experience plus the square root of the architect's birthdate. And that tells you a due date. We also had teams estimate with what today we'd call story points and ideal days. Most of our projects were two to three months long. And every time a team finished a project, they looked at how well their estimating approach had worked. They looked it how what other teams were doing had work. and they decided what to do next. Based on the rules I'd put in place, each team had to try something different on each new project. It didn't have to be dramatically different, just a little different would do, but they had try to something. When we first started, I thought an approach we'd been dabbling with called Experienced Senior Programmer Days would turn out to be the best. I wanted it to win. And not just because it had the great acronym of ESP Days. The premise behind this approach was that each team member would estimate as though he or she were an experienced senior programmer. It was a way of normalizing what today we call ideal days. And it was an attempt to get around the problem that your ideal days aren't the same as mine because we have different skills and experience levels. These teams had a definition of an experienced senior programmer. And each team member estimated as though they were that person. So people were estimating for themselves and then adjusting longer or shorter for this archetypal experienced Senior Programmer. It was a nice theory, and it had worked well on an initial project. But it worked because the people on that initial project were all pretty close to the archetype. When other teams tried it, we realized it wasn't going to work. It's hard enough estimating how long something's going take you to do. This approach required everyone to estimate how it would take a mythical person to. Bad idea. But I had thought it would work. Fortunately, although I went into that experiment thinking experienced senior programmer days would be our winning idea, I was open-minded enough to realize, hey, it could be wrong about this. And the rest of the department went in to the experiment with a similar attitude. After the first projects finished and teams were picking their second approaches, we saw teams begin to coalesce around certain ideas. Parametric estimating was out because it relied on having something like lines of code or function points to multiply and divide by. And estimative lines a code was no easier than directly estimated the length of a project. The task decomposition was out because it was too time consuming and because was impossible to think of all the tasks anyway. Through nothing I did other than put in a rule that said no two teams can estimate the same way, our teams were converging on approaches around story points and ideal days. There were still some big differences in how teams thought about those, but the differences were smaller than when some teams were advocating parametric estimating or task decomposition. These teams, in fact that entire development organization, had learned quite a bit about how to plan projects. But as the teams were not yet close to agreement on an approach, the experiment continued. We had teams experimenting with different number sequences, 1, 2, 4, 8, 16, or the Fibonacci sequence, for example. Other teams experimented with whether it was better to always round estimates up. always round estimates down. Still, other teams experimented with how to conduct estimating meetings. Some teams, experiment with what turned into planning poker. Other teams tried more traditional Delphi and wideband DelPhi approaches. Other teams tried creating checklists of things to consider, or even having only one or two people estimate each product backlog item. Based on what I've been writing and training about for so many years, you can probably imagine where we ended up. But where ended isn't the point of this story. The point is that when we started this experiment on various approaches to estimating, I had an idea of what would work. But I told myself, you know what? I could be wrong. So we starting experimenting. And it turns out I was wrong, but you what I learned from being wrong? Enough to write a book, Agile Estimating and Planning. You know, what else? Parts of this book could wrong! In fact, I recently looked and pages 238 through 240 are wrong, as are I'm sure other pages. I wrote them because they're what I believed then. But they are not at all what believe today. And that's the key to success, not just in this story, but with Scrum, with Agile, and with life for that matter, being willing to learn. Everyone in that company knew we were not good at estimating, and we wanted to get good estimations. During the process, we had some very fierce arguments, but we didn't let those arguments get in the way of learning from what we're doing. In putting this talk together, I was at first reluctant to call those team members open-minded because I remembered some of those fierce debates. But I looked up open-minded in a dictionary, and it just means willing to consider new ideas. And yeah, fortunately, just about everyone on those teams in this story was willing consider ideas, even those who were very opinionated were at least willing. You know what? That's all we needed. The courage to say, hey, I could be wrong. I think it's vital that we approach Agile with an open mind. Fine, go into a situation thinking you're right. Think like I did, that experienced senior programmer days is going to be the answer. But reserve that little bit of open-mindedness that says, hey, I could be wrong. What was the last thing about Agile that you changed your mind about? It could be something relatively small, like deciding one week sprints are better than two weeks sprint. Or it could something that required a leap of faith, including your product owner in retrospectives. Whatever it is, can you think of something you once firmly believed about how to run an Agil project that no longer believe? This type of openness is important to the progress of Agiles. Think about what Scrum would look like if early Agilist had never thought, but hey, I could be wrong. I asked a few prominent Agillists for things they changed their minds about. Let me share a view with you. Ron Jeffries and Chet Hendrickson are well known for having abandoned estimating. That's like a dagger to my heart. They used to advocate estimatin' product backlogs, items, and story points. But they thought hey we could wrong, they now coach teams not to estimate at all. Ken Rubin, author of the Essential Scrum book, was once adamant that the scrum master not also be part of a team. He now says a scrumm master should be a development team member. Mitch Lacey, the author the Scum Field Guide, like many of us, took the daily scrums as gospel. You have to do it daily. Since he told himself he might be wrong about that and says that some high performing teams can get by without a daily scrum because they're essentially communicating every minute of every day. Robert Martin, who convened the Agile Manifesto meeting, pushes all programmers to take their craft seriously. But he told me he was a complete skeptic about test-driven development when he first heard about it. He was so skeptical, he flew to Oregon to pair a program with Kent Beck and try test driven development. That experience rocked his world, and he changed his mind. In his first book on scrum, The Black One, Ken Schwaber wrote that one of the main duties of The Scrum Master was to make sure there were enough chairs at the Daily Scum. I'm sure Ken doesn't believe that anymore. Jean Tabaka, author of Collaboration Explained, used to focus on sprint planning and sprint reviews as a team's main inspect and adapt checkpoints. But she told me she later learned that usually isn't enough. She learned teams benefit from a form of mid-range planning or road mapping in order to really create awesome products. Henrik Nyberg, author of the book Scrum and XP from the Trenches and the great Spotify culture videos, once believed that each team needed a dedicated scrum master, but he told himself, hey, I could be wrong. And he now says it's fine for a full-time scrumm master to perhaps work with up to three teams. Henrik also believed that teams should be stable with the same team members from sprint to sprint. That's something I still believe. But Henrek is one of the most open-minded people you'll ever meet and says, sometimes it works really well to have dynamic teams where people switch around as needed. His open mindedness made me think, hey, I could be wrong about stable teams. Scrum butt is a well-known joke in the scrum world. Our team does scrumb, but we don't have anything shippable at the end of the sprint. our team doesn't scrump, BUT we do three-month sprints. We like to make fun of scrombut. But can't you imagine early scrumm projects being called waterfall butt? Early scrummy teams must have existed in waterfall organizations, But they were trying something new. I'm sure what they we're trying was laughed at and called Waterfall Butt. Picture their co-workers laughing as those early Scrum team members said, we do Waterfall, but we integrate weekly. Or, We do waterfall, But we test all the time. What's new is often laughed at. A huge challenge is that we can't know in advance which new practices are going to work and which aren't. We have to try them and see what works. In doing so, we have approach each new practice as an experiment saying, I think this will be better than what we're doing now, but hey, could be wrong. Saying I could wrong isn't nearly as hard as admitting after the fact I was wrong, In fact, my wife likes to tease me that I have a hard time admitting when I'm wrong about things, at least in our personal lives. Back in the 90s, she and I used to watch a TV show called Mad About You. It starred Helen Hunt and Paul Reiser as a 30-something married couple living in New York. In one episode, the husband got a chance to invest in a virtual reality company. As an early stage investor, he gets to try out the product before he invests. So they show him putting on virtual reality goggles and virtual-reality gloves. And in this particular product, the user gets the conjure up a virtual Reality in which to interact. Well, the virtual reality the husband conjures up is of himself rubbing sunscreen on a swimsuit model. And after that, he's ready to invest. Except his wife needs to try out the product. You can see him getting nervous, because if that's the reality he conjured up, what's his life going to invent? Well they show her putting on the Virtual Reality goggles and the VR gloves, and reality she conjurs up? Is of her husband repeatedly saying, I was wrong. I were so wrong, very wrong and so on. The vastness of my wrongness was staggering. My wife has that clip saved on YouTube and shows it to me anytime she says I'm refusing to admit that I am wrong. Fortunately, I have a much easier time admitting when I wrong about something involving Agile. Let me share with you a story about a time I was wrong something about involving Scrum. Back in its early days, Scum did not have retrospectives. That's probably not very surprising. No one thought about it at first. But you're probably thinking that as soon as someone did think about it, we all quickly added retrospectives to our sprints. Well, not really. Many people did, of course. They very quickly add retrospective. But some of us, me included, did not. I know that sounds crazy now, but it's something I was wrong about. See? I can admit that. Let me tell you why I was wrong. My objection was basically, why should a team member wait until the end of the sprint before sharing with the rest of team a suggestion for how they can improve? If I come up with an idea that will help us build better software, I should share it with my teammates immediately, not at the ends of sprint. But here's what happened. Suppose I do come with some great idea in the middle of some day in a sprint? I'm not going to stop programming right then to tell everyone about it. Besides, everyone's doing their own thing. So I tell myself, I'll tell everybody about tomorrow's standup. But tomorrow stand up? I can't remember what it was I wanted to them. What teams learned, what I learned was that it was better to set aside a designated time to talk about ways to improve. Of course, it's theoretically better than jump up and tell a team about a great improvement idea right when you think of it, but you probably won't do that. So set a side a designated time every sprint. There's nothing that prevents you from jumping up in sharing some amazing improvement immediately if you do happen upon one. I was wrong. I thought that just talking about improvements whenever someone thought of one would be better. It wasn't. Being able to admit when we're wrong is important to maintaining an open mind. We can be opinionated, but we have to remain open-minded. Frank Zappa, the musician, said, a mind is like a parachute. it doesn't work if it's not open. Here's my challenge for you. Think about some of your long-held beliefs about Agile. Find one or two things you believe and say, hey, I might be wrong. Then do some research on the Mountain Goat software site with Google or with the AI of choice. Actively seek out counter opinions. Saying I could be right should feel liberating. Admitting that we don't always have to be But it doesn't feel that way. So let's take a look at some ways we can ensure our minds remain open to new possibilities. Back in the 1970s, California had a senator, S.I. Hayakawa. The senator had young son, and one evening he was drawing a bath for his son. When the tub was full, the senator put his sun in it. But as soon as he did so, his sons screamed, Dad, make it warmer. The senator, suspecting that, if anything, the tub water was too hot, reached down and felt the water. It was indeed too-hot. Yet his son was screaming for him to make it warmer. But make-it-warmer means add hot water! So what's going on here? question your assumptions. I think I know what make it warmer means, but I could be wrong. Fortunately, the senator questioned his assumptions when his son said make-it-warmer, he meant make closer to the state I call warm. To a young kid, there were temperatures of cold, warm, and hot. Make it Warmer meant move the temperature closer warm Fortunately, Senator Hayakawa realized this and turned on the cold water. Back when my daughters were that age, if they'd said, Dad, make it warmer, I wouldn't have thought about it, and I would have cranked up the hot water! My problem is that I'd not have stopped to question my assumptions. I just would've gone along with the seemingly reasonable assumption that make-it-warmer meant to add hot-water. Questioning our assumptions is vital to remaining open-minded. Let me give you another example. When I was seven years old, I on a family vacation driving up the coast of California. And I think I being a particularly obnoxious seven year old. I probably was pestering my dad with questions. My dad took out a piece of paper and drew this image. two rectangles on top of three rectangules. My dad told me he would give me $100 if I could draw a single line that went through every line segment once and only once. $ 100 to any seven-year-old is a lot of money. It was a fortune back then. All I had to do was to draw one line through each line's segment. I can start inside or outside the rectangoles. So I tried for hours to get it right. When I have a solution, like the one on the screen, I'd hand it to my dad. He'd show me I was wrong and then I'd try again and I hand my dad another solution. He would say, you went through a line twice. I tried for the entire drive up the coast. We got to a campground that night and tried by flashlight. For the next 12 years, For 12 years, anytime I had to spare a few minutes or was bored anywhere, I remember trying in the margins of my notes during high school classes. I remembered sitting in a waiting room at a doctor's appointment. For twelve years I tried to solve this problem. It wasn't until my sophomore year of college and a lecture on graph theory that I even began to question my assumption that there was a solution. Some of you by now will have recognized this as a variation on the famous seven bridges of Konigsberg problem that Leonhard Euler proved has no solution. But because the problem had been given to me by my loving father, I assumed it could be solved. When we fail to question our assumptions, we can stubbornly repeat our mistakes over and over. For 12 years, i've failed to questions my assumptions. Question your assumptions because you know what? Your assumptions could be wrong. There are really two things that make assumptions so dangerous, confirmation bias and hindsight bias. Confirmation bias is our human tendency to look for information that confirms our beliefs. Suppose you don't like one week sprints. You're convinced they're too short. If you go to an Agile conference, you might hear, let's say, eight anecdotes about the evils of one-week sprits. you'll hear just as many anecdots about evals of sprint of any other length. Because you're looking for it though, You'll be more attuned to noticing the problems with one weeks sprin. I have a daughter named Savannah. In choosing her name, my wife and I wanted a name that was recognizable, but that she wouldn't share with five other kids in her kindergarten class. We thought the name Savannah fit the bill, and so we settled on that midway through the pregnancy. And then we started to hear the named everywhere. we even reconsidered it. Weren't hearing the names any more frequently than before we'd selected it, we just became more aware of it." That's confirmation bias. We need to be aware of this because confirmation bias convinces us that things we believe are true, even though they may not be. The name Samantha had not become massively common overnight. One-week sprints do not create more problems, but if you think they do, you're likely to notice them. Somewhat related to confirmation bias is hindsight bias. Hindsight bias makes us forget how ignorant we once were. I love being a writer, but one thing that absolutely sucks about it is that your words are out there forever. You might forget that you ever believed a certain thing, But if you wrote in a book, someone will eventually remind you about. Here's an example that happened to me that has to do with sprint planning. strong advocate that a team should leave the sprint planning meeting without having assigned all the tasks to specific team members. That is, we should lead with a big pool of tasks, but we shouldn't leave with some tasks assigned to you, some to him, someone to her, and someone me. Instead, just have a pool unallocated tasks and each day we figure out who should work on what. Well, that's not what I wrote about in user stories applied back in 2003. Back then, I write that the team puts a name next to every task, because up until then that was how I'd been doing it. I changed my approach shortly after that book came out. So a few years back, I was teaching a Scrum class, and I'm teaching the approach where we do not put names on tasks. And I am teaching that approach as though I'd believed it my entire life, because as far as I can remember, this is what I've believed my whole life. But as soon as we finished the little discussion on that topic in class someone asked me about what had I written in User Stories Applied. This is an example of hindsight bias. It convinces us that we've always been as brilliant as we are now. Be aware of your biases. be aware that you might only be looking for and listening for things that back up what you already believe. Make a deliberate attempt to seek out things, that challenge your assumptions instead. You might be surprised by what find. So the first thing we need to do to stay open minded is question our assumptions. The second thing, we should do is exhibit intellectual humility. I remember seeing this term in an article about hiring practices at Google. the article said that Google likes to hire people who exhibit Intellectual Humility. Intellectual humility is an idea from John Stuart Mill back in the 19th century. Mill said it was a virtue to be able to imagine one of your most fundamental beliefs being wrong. Intellection humility also has to do with understanding the boundary between what we know and what merely believe. As an example, I think sprints or iterations are a good thing. I don't have any proof of that. But I do think there's something valuable about a team getting together at the start of a period of time, deciding what to do, and then getting it together the end of the period and seeing how they did. It would be intellectually arrogant of me, the opposite of intellectually humility, if I were to claim this as a fact. So intellectual humility has to do with knowing what you don't know. And I'm going to repeat that. Intellectual humility, has, to, do, with, knowing, what, you, DO NOT know Here's a good example of a time when I was not intellectually humble. When teaching, I asked a lot of questions. I remember asking a class, who does such and such in Scrum? I, was looking for someone to say the Scum Master, but no one answered. As I started to open my mouth to save the Scrum Master, someone yelled out, the team. And he was right. My lack of intellectual humility had me ready to answer a question without pausing to really think about it first. Shortly after this, I read an article in The New York Times about a professor from the University of Chicago. This professor had a great attitude that really captured intellectual humility for me. He said, when you're teaching, always assume there's a silent student in the class who knows more than you do. I remind myself of that frequently.I want to share one more example of a lack of intellectual humanity. anyone without talent who has ever appeared on one of TV's talent competitions. Think about some of the horrible singers who show up on TV and we laugh at how bad they are. They must know they can't sing. Well, it turns out they don't know this. This is due to something called the Dunning-Kruger Effect. The Duning- Kruger effect says that the less you know about a subject, the lesser you think there is to know, about that subject. It's what lets amateurs think they're experts. A horrible singer on TV talent shows is probably a little better than her friends, so she thinks she's talented. Her friends don't want to hurt her feelings so they let her believe it. All of a sudden she is on national television. Instead of going on tv, she might want stop first and think, I could be wrong about my talent. The less we know about something and the less experience we have at doing it, the worse we are at judging the depth of our knowledge. A little knowledge is a dangerous thing, right? Agile is no different. I once looked at self-assessment results from teams at a company I was working with. The assessment asked about practices that contribute to quality. Were tests being automated? Were testers involved from the beginning? was the product owner helping to find acceptance criteria. We compared teams that were about six months into their Agile adoption with teams have been doing Agil for roughly two years. And we found something surprising. The teams with only six-months of experience rated themselves higher on quality than the teams two-years experience. If you looked only at their answers, you might conclude that the more experienced teams had somehow gotten worse. But if you visited those teams and watched them work, the opposite was obvious. Those teams have improved considerably. So what was going on? The teams with six months of experience thought they were doing great. Asked whether they tested early and often, and they said, testing is through the roof. It's all we do. We write two or three, sometimes even four tests per sprint. To someone new to agile development, that sounded like a lot. They didn't know what they didn' know. After two years, those teams had a very different perspective. Now they we're saying, we test all the time, but it's still not enough. we have so much further to go. They hadn't become worse at producing quality software. They'd become better at recognizing what good really looks like. That's the Dunning-Kruger effect. When we know very little about something, we often don't know enough to recognize the gaps in our knowledge. As our experience grows, our judgment improves, and we begin to see how much more there is to learn. So especially when you're first learning, remind yourself of the need for intellectual humility. And just when your certain you've mastered something, Remind yourself how far you may still have to go. I want to talk about one last thing that sometimes prevents us from being open-minded, and that is becoming too loyal to any one brand of Agile. If we want to keep learning and growing, we cannot become too strongly attached to a single brand of Agile. A few years ago, I was witness to an online discussion involving Ron Jeffreys. At the time, Ron was considered much more of an extreme programming advocate than a Scrum guy. And Ron, was in a discussion with some Scum folks. The discussion started to shift into the direction of XP versus Scumm. And Ron had a perfect comment about the brands. He said, I'll drop mine if you drop yours. For many years I've said that I consider myself an unbranded Agilist. Sure, get associated with Scrum because it's largely what I do. And it was what started with many year ago. But I like to pull ideas from everywhere. I'm pretty much known as an advocate of user stories and story points. Both ideas that come from extreme programming, but ideas I started using on Scrim projects. Like Ron Jeffries said, I'll drop mine if you drop yours. I'm eager for everyone to drop all their brands someday. i don't even want what we do to be called Agile anymore, i just want it to become software development again. If you find yourself enamored of a particular brand of Agil, say I might be wrong and actively seek out dissenting views. Question your assumptions, exhibit intellectual humility, and let go of our brand preference, even if only for a moment. I think he'll be pleasantly surprised. I've said we need to be open-minded, but please don't misunderstand me. It don' mean we have to question everything. The sun will come up tomorrow. That is a certainty. There's no need think that I could be wrong about that. Similarly, there are certain rules within Scrum that we can be sure about. If we change those rules, we're creating a process other than Scum. Might even be better than Scrum, But it's not Sc rum. And for a few minutes, I want to stick with just Scrum for this discussion. If we do, there are certain rules we don't want violate. We don' t need to waste time pondering whether they're right. These are things like sprints can't be longer than a month. Be done with something by the end of the sprint. And get together at the start of a sprint and figure out what you'll do during the Sprint. For that last one, I'm not saying there's some grandiose sprint planning meeting. There's just some initial discussion of what we're going to work on that helps team members all pull in the same direction during the sprint. We want to be careful here. we don't want turn Scrum into a list of rules. In fact, I've deliberately never sat down and created what I'd consider a complete list of Scrum rules. The danger with a list rules is that we start to lose creativity and spontaneity. So it's important to keep the list Scum rules to an absolute minimum. I think it is good to have a small set of rules that define what Sc rum is. These are things that if you aren't doing them, the Scrumb police can knock on your door and rightfully say, you're not doing Scram. What that team is doing might be better than Scrum, but if they're violating a Scum rule, it's not Scumm. Here's an example of going too far with a rule. Are you aware that one of the main books on Scurm says that the daily Sc rum must be conducted left or right, starting with the person to the left of Scrum Master? Well, one of the Scrum Masters that a client I worked with knew this rule, and he insisted upon following it. If it was in the book, then this Scum Master was going to follow the rule. His team knew that this role was ridiculous, so they rebelled. They'd choose to go right to left instead, or they would choose people to speak randomly, Or they moved around during the meeting. they'd do anything but go left to right, as the scrum master wanted them to do. The team was trying to show their scrum master how ridiculous that rule was. Going left to right should never have been described as a rule. A few rules are fine, but we want to keep them to a minimum. Frankly, I don't find talking about or thinking about Scrum rules all that interesting anyway. What I find interesting is thinking the practices of Sc rum. Some of the practice Scum teams use are technical and come from extreme programming, things like test-driven development and pair programming. Other practices are more focused on the product backlog, like user stories and product-backlog refinement. Not all teams do these practices, but that's why we're going to categorize them as practices rather than rules. Having a definition of done is a great practice that many, perhaps most, Scrum teams use. It's not a rule, though. In other words, you can still be doing Scum even if you don't have one. Here's a really minor little practice I'll mention. Don't start sprints on Mondays. When I first started doing Scrum, all the teams I worked with started sprint on Monday. I wouldn't even think about it. Of course sprinters start on mondays, it seemed obvious. But Monday's kind of suck for starting a sprint. No one wants to come to work on a Monday, especially if Monday has a long planning meeting scheduled. All of a sudden, Monday starts to look like a great day to schedule things like dentist appointments because even a root canal can be better than going to a long meeting. Also, we have a lot of Monday holidays here in the U.S. All our presidents were born on Mondays. Monday's are just kind of bad day start a sprint. This is not a common practice. It's not well known. Not even all that important. Certainly not as important as the other practices I've listed. I'd put it in the category of just a nice little optimization that could be helpful for some teams. Sprint Zero is another practice that a lot of teams like. Maybe it's not a great practice or even a good one, but it is a pretty common practice, so it worth including on any list of practices. The same is true for task boards, another extremely common practice for Scrum teams. When we look at all these practices, it's clear that some of these are more important than others. Some of them are so important, in fact, that I think just about any good Scum Master should be aware of. Think about a practice like pair programming. Imagine walking up to someone who announces, I'm the world's greatest Scummaster. First of all, the world's greatest scrum master is probably not the type of person who would ever say something like that. But imagine someone says it, and you think, that's great. What do you a pair of programming? And the World's Greatest Scrum Master says, never heard of it. Well then, That's not The World Great Scum Master. I'm not saying the world's greatest Scrum Master has to have his or her team doing pair programming, but the World's Greatest Scum Master had better know what it is. Even if their opinion is pair-programming sucks, I never recommend it. I am fine with the WGSC having a strong opinion about any of their practices. But this is where I'd hope that that great Scrum Master and I could have a conversation. And while we each enter that conversation with a strong opinion, I also want each of us thinking, hey, could be wrong. Because these are the things we need to stay open-minded about. The rules are rules, and we can't fiddle around with those. Fortunately, there are not many rules and they're easy to live with. But where agile gets interesting is with the practices. Which practices work best? And which combination of practices works best. And does that change by domain? Does it change my team size? That's where things get interesting. That where we need to be the most willing to learn from one another. By having opinions, yes, but also by always admitting I could be wrong. I enjoyed the Cosmos TV show with Neil deGrasse Tyson, but I think the original from 1980 was even better. It starred Carl Sagan, who commented on the importance of scientists being open-minded. Sagen said, it often happens that scientists say, you know, that's a really good argument. My position is mistaken. And then they actually change their minds. You never hear that old view from them again. They really do it. It doesn't happen as often as it should, because scientists are human and change is sometimes painful. But it happens every day. I cannot recall the last time something like that happened in politics or religion. And I don't want to talk about politics and religion, but I'd like to add Agile to Sagan's list. There are too many of us who are no longer as open-minded about various aspects of Agile or Scrum as we should be. When confronted with a great view that is different from our own, we don't say, you know, that's a really good argument. My position is mistaken, as Sagan says a good scientist should do. At least we do not say it as often as should. You've invested time watching this video, and I hope you don't finish up believing exactly everything you believed when you started. My challenge to you and to myself is to keep looking for those moments when we can say, you know, that's a really good argument, my position is mistaken. Because if we never change our minds, we're probably not learning very much. So question your assumptions. Something you're doing may be working very well for you, but ask yourself why it's working. Is it broadly useful? Or is it working because of something unique about your domain, your team, or your situation? And when you hear about an approach that's different from yours, don't dismiss it just because what you're doing already works. Be willing to consider that you've learned something useful from your experience, but perhaps drawn too broad a conclusion from it. That's where intellectual humility matters. Remember, the less we know about a subject, The less tend to realize there is to know. The more experience we gain with Agile, more we should appreciate how much context matters We're dealing with people, teams, organizations, and complex problems. There probably isn't one right answer that works everywhere. and don't let brand loyalty get in the way either. I love Scrum. For much of my career, it's paid my bills. But two of the ideas I'm most closely associated with, user stories and story points, came from Extreme Programming, a different brand of Agile. So take good ideas wherever you find them, Scrum, XP, Kanban, somewhere else entirely. Don't reject an idea because it came from the wrong process, and don't accept one just because came it from your favorite process. Let go of knowing. Be open to experimentation. And be willing to say, as Carl Sagan said we should, that's a really good argument, my position is mistaken. If you loosen your grip on your own certainty just a bit, what I think you'll find is a whole world of possibilities, a new path to learning and growth that you might never have considered. But that's just what i think, and hey, I could be wrong.