Estimating Work Shared Between Two Backlog Items

Product backlog items can be ideally written to be independent. It is the hallmark of a good team that its members can implement product backlog items in any order. However, it would be nearly impossible to remove all dependencies between product backlog items and so our goal becomes minimizing important dependencies rather than eliminating them altogether. But any dependencies that remain can raise questions about how to estimate the individual product backlog items. One common agile project management question is what to do with work that could be performed as part of either of two backlog items but that only needs to be done once. As an example, consider these two product backlog items, which are written as user stories:

  • As a user, I can add an invoice to the system so that it gets paid.
  • As a user, I can delete an invoice.

These two user stories share some work. Supposing this is a very simple system, whichever one of these stories is done first will also involve the team much of the database design for invoices. Some database design work (a cascading delete between Invoice and Line_Items, for example) will be done only when a specific one of the stories is developed. But, some work (deciding that a table called Invoice exists at all, perhaps) will be done as part of whichever story is implemented first. Assuming that this work is non-trivial, the estimates given to these stories will be influenced by which will be implemented first. In deciding how to estimate these and how to handle the common work between them, I suggest there are two guiding principles we can rely on:

  • We should assume work will be done in its natural order.
  • The sum of all estimates on the product backlog should represent the total size of the project (as understood at that time, of course).

Let’s see how these two principles lead to the answer about how to estimate our two user stories about adding and deleting invoices. Although a good agile team should be able to implement these stories in either order, it is most likely that the product owner will ask the team to add invoices first. After all, you can’t delete an invoice until it has been added. This is what I mean by the natural order. Although it is natural to add invoices to a database before deleting them, it is not hard to imagine a need to do these in the opposite order.

Suppose our team is writing a new system to interface with an existing invoice database. That existing system is full of old invoices from the 1940s and the first thing the product owner wants is the ability to delete old invoices. When a product wants stories done in the natural order or when it seems likely the product owner will want them done in that order, my advice is that the team should estimate with that assumption in mind and not bother noting it on the story cards. Documenting all logical assumptions about the natural order gets tedious. To document all such assumptions, our add an invoice story would also need to be documented with “assumes login story is done first,” and so on. But when a team knows or suspects they will be asked to work out of the natural order, they should document the assumption. If the team assumes that adding an invoice will be quicker to implement because deleting is already done, they should add appropriate notes to these story cards.

Teams are, of course, sometimes wrong in their assumptions or are surprised by product owners who change their minds. These situations are resolved by simple discussion along the lines of saying “We assumed you’d want these stories in a different order. So, a few points [or ideal days] of work move off this story and onto that story.” It is even possible that working outside the natural order can sometimes increase the total size of the work.

For example, to do the delete invoices user story before the add invoices story, our team might need to write a short script to preload the database with dummy data just so we can be sure delete is working. Usually when this happens the change in project size is very small and washes out in the noise of other estimating and planning errors. (In other words, it’s rarely worse than someone being out sick for a day.) Why not get around this problem of potentially moving points from one story to another by assuming that each story is done first, which would be a worst case for its estimate? This is where our second principle comes in: The sum of the estimates should add up to the total size of work being considered. If the total work is 8 and that’s what we’d put on a single add+delete user story then our two user stories need a total of 8. To put a higher number on them overstates the size of the project. This would lead to incorrect projections of the project completion date based on velocity.


A Free PDF to Help You Choose the Approach

A Free PDF to Help You Choose the Approach

I’ve created a PDF you can download that will help you decide which approach is best for any story you’re adding detail to. It also includes examples of the two approaches.

Download my PDF
Mike Cohn

About the Author

Mike Cohn specializes in helping companies adopt and improve their use of agile processes and techniques to build extremely high-performance teams. He is the author of User Stories Applied for Agile Software Development, Agile Estimating and Planning, and Succeeding with Agile as well as the Better User Stories video course. Mike is a founding member of the Agile Alliance and Scrum Alliance and can be reached at hello@mountaingoatsoftware.com. If you want to succeed with agile, you can also have Mike email you a short tip each week.